Research on Electric Vehicle User-side Optimization V2G Control Strategy in Parking Lot

    • Presentation speakers
      • Xiaofei Liu, Post Doc, Hisense Research and Development Center

    The problem how to realize EV user’s profit maximization is studied when V2G is operating in parking lot. Several electric services are compared from user’s side, and services suitable for V2G are found. Aiming at low power charging and V2G frequency regulation, taking profit maximization as the objective function, V2G control strategy based on optimal contract is proposed considering the effect of frequency charging and discharging on EV battery degration. Finally, a computing example is given and profit analysis is conducted for single EV user and V2G parking lot.

 

Leave a Reply

 

Your email address will not be published. Required fields are marked *